|
Survey at Smannell Andover undertaken for WSP
Full land survey of 350ac tied to the OS national grid by GPS to OSGB36
Provide 2d & 3d AutoCAD data and Moss GENIO file
|
|
Survey of West Norwood Cemetery undertaken for WS Atkins
Level survey provided in AutoCAD 2d and 3d formats
Overlaid onto Ordnance Survey Digital mapping
|
|
One of forty WWTW Sites undetaken for Southern Water PLC in 2003
Provide full Topographical and Services surveys in AutoCAD format
|
|
Part of 12kms line survey at Brighton And Hove for Mott Macdonald
Detailed topographic survey along the seafront. Control based on the Ordnance Survey fixed by GPS
|
|
Lake survey at Gatton Park for the Royal Alexandra School
Produce contoured drawings showing depths from the water level to the top and bottom silt levels of the lake bed
|
|
Survey of Billington Drive Flood Pond for Crawley Borough Council
Full detailed survey produced to 1/200 scale
|
|
Survey at south Aylesford Retail Park for Mountford Pigott Partnership
Full topographic survey to 1/200 scale of a retail park
|
|
Survey of Tower Park Poole Leisure Center Poole for The Colman Partnership
Full detailed survey to 1/200 scale 2d and 3d data provided in AutoCAD format
|
|
Survey of the Rail Head at Tilbury for Hyder Consulting Limited
Part of a detailed rail survey of the approach loop track at Tilbury Docks
Data provided in MXRail format
|
|
Surveys for the London Buss Initiative undertaken for Croydon Council
Detailed Surveys of a number of sites tied to the national grid produced to 1/200 scale and 2d AutoCAD
|